SECTION 28 15 00
INTRUSION DETECTION
28 15 00-6 13-HC1-033
C. Refer to Section 26 08 40, "Electrical Tests, Adjustments, Inspection."
3.03 SPARE PARTS
A. Division 28 Contractor shall furnish one spare device for each type used, including keypad,
passive infrared detector and door contacts.
B. Obtain a signed copy of the Certificate of Material Receipt from Section 26 00 99,
"Requirements for Contract Completion."
C. Coordinate the I/O interface, programming and wiring with CCTV System supplier
(Section 28 23 00, "Video Surveillance System") for control and monitor of the CCTV
System.
3.04 EQUIPMENT DEMONSTRATION
A. After all system tests have been completed, schedule an instruction period with the Owner.
Instruction to be provided by Manufacturer's authorized field technician. Provide four
separate sessions of four hours. Record sessions on DVD and furnish two copies to school.
B. Instruction shall include:
1. Location of all components of the system and explanation of their function
2. Demonstration of equipment
3. Maintenance and repair procedures
4. Programming procedures
5. Review of documents in Record and Information Manuals
C. Division 28 Contractor shall have all participants sign the Certificate of System Completion
in Section 26 00 99, "Requirements for Contract Completion."
3.05 WARRANTY OF WORK
A. The Division 27 Contractor shall warrant all materials, equipment and workmanship for a
period of one (1) year from date of completion. Refer to Section 27 00 00, "Division 27 -
Communications Introductory Statement."
END OF SECTION
Komentáře k této Příručce